Commercial & Contract Glazing
See where every job and every dollar stands, without walking the shop.
Bids, submittals, POs, schedules, field progress, and AIA billing — in one platform built for commercial glazing. Real-time visibility so you can scale without adding chaos.
Built for contract glaziers · GDS, PartnerPak & Glazier Studio · Real-time, one-way QuickBooks sync

Your business is running in silos — and they don't talk to each other.
Estimating in a spreadsheet, tracking in another, the field in text messages.
Job progress is a guessing game — you're waiting on the field to tell you where things stand.
You call the shop to ask if the aluminum showed up, then call again about the glass.
Submittals, change orders, and schedule of values tracked by hand, linked to nothing.
Change orders slip through — sometimes you catch them, sometimes the work just goes unbilled.
It all works… until you try to grow, and every manual step becomes the ceiling.
Real-time visibility & PO tracking
One dashboard for the whole company.
See every active job's status in real time — pre-con, in fabrication, shipping, on site, installed — without checking in with each department. Customizable dashboards give every PM and owner the numbers they care about at a glance.
PO tracking that closes the loop: enter POs once; when a delivery lands, the shop checks it off and you get an automatic notification — no more phone calls to the back. Job phases, key dates, and a Gantt view keep multi-month projects on schedule.
"We're not digging for stuff anymore. Attachments, submittals, schedules — everything's in one place now."
Taylor Lozano · Nor-Cal Glass


Bidding & Preconstruction
From invite-to-bid to a branded proposal — without leaving the platform.
Centralized bid management, lead and pipeline tracking, supplier quote requests, submittals, and a branded proposal builder. Smart Takeoff pulls elevations, schedules, and dimensions from your drawings — a first pass you confirm. Integrates with Glazier Studio, GDS, and PartnerPak.
Keep the estimating logic you've perfected — bring your numbers in via templates or Excel import, and let Glazier handle everything downstream.
Field & Shop
Connect the field, the shop, and the office — in real time.
A native iOS & Android app for foremen and crews: job progress, floor-plan pins, photos, daily reports, and PO receiving from the site — so nobody drives back for a spec. Geolocation time tracking logs hours to the right job for accurate labor costing. Fabrication tracking, pick lists, custom checklists, and a drawing tool keep the shop moving.
"It saves conversation time — 'What floor are you done?' — and lets us tell the customer exactly where we're at."
Jason Sproul · Avanti Glass & Mirror


Financials & Billing
Catch every change order. Cost every job as it happens.
Change orders captured on the job — including the ones that used to go out unbilled. AIA billing (G702 & G703) with retainage and progress billing, generated from the job instead of manual forms. Real-time job costing logs committed costs at PO and actuals at payment. Labor planning, embedded payments, and automatic QuickBooks sync close the loop.
"I'd have to pull manual forms and fill them out… with Glazier it creates the schedule of values, it creates the pay app."
Tara Roberts · Lee Glass
The complete commercial platform
Everything a contract glazier runs, in one place.
Five areas of the platform, each with its own page. Pick the one you are trying to fix first.
Bidding & Preconstruction
Lead Management
Smart Takeoff
Bid Pipeline
Estimate / Budget
Submittals
Supplier Quote Requests
Proposal Builder
Project Management
Project Pipeline
Work Orders
Material Management & Pick Lists
Inventory Management
2-Way Email
Floor Plan Tool
Purchase Order Tracking
Daily Reports
Scheduling, Labor Planning & Timelines
Gantt Chart
Phases & Key Dates
Labor Planning
Smart Scheduling
Field & Shop
Technician Schedule
Geolocated Time Tracking
PO Receiving
Custom Checklists
Fabrications
Pick Lists
Financials & Billing
Job Costing
Change Orders
AIA & Progress Billing
Accounting Sync
Integrations
Plugs into the tools your shop already runs.
Real-time QuickBooks sync — plus the glass-specific systems your estimators and buyers live in. Metal takeoffs and material lists flow straight in.

Real-time sync



Supplier catalogs
Onboarding
Go live in months weeks.
Switching feels risky — so our team does the heavy lifting. We configure your workflows and pricing, train your crew hands-on, and get you live at your pace. Start with the users you need and add more anytime.
ONBOARDING
Your shop
1 · Configure — your workflows, pricing, templates
Done for you
2 · Train — office and field, at your pace
Hands-on
3 · Go live — running real jobs, support a message away
In weeks
"Making the transition to Glazier could not have been smoother… we never felt rushed."
Andrea Elliott · Elliott Glass
Why Glazier for commercial
The clear glass-specific choice for contract glaziers.
Generic construction PM tools and big ERPs like Microsoft Business Central can do a lot — but they need heavy customization to speak glazing. Glazier is built for it out of the box, by operators with 500+ years in the trade. That's why we've focused our roadmap on commercial, and why contractors doing $50K to $5M jobs choose us.
Generic field-service tools
No POs, no glass pricing, no shower or storefront work.
Big ERPs
Powerful — after months of expensive customization.
Glazier
Built for glazing out of the box — POs, AIA billing, takeoffs, storefront & curtain wall. Proud NGA member.
20 min quoting with live job costing.
"It creates the schedule of values and the pay app."
Lee Glass
"Everything's in one place now."
Nor-Cal Glass
"Visibility into the health of my business."
Palmetto Door & Glass
"We're billing the maximum we've earned, as early as we can."
American Glass & Glazing
Get started